Improvements Carried Out

These are the things which have been done this last week:
  • Skirting board fitted on the landing
  • New wooden trim at the top of the stairs
  • New wood covering all of the beam next to the stairs
  • All the "junk" (decorating etc stuff) has been moved from the boiler room
  • The workshop, a private room at the back, is now used to store the decorating stuff
  • The "lean-to" at the back has been cleared and the wood tidied up
  • Two bikes (one adult, one kid) now kept in the wood store
  • Kitchen cupboard between the cooker and fridge now fixed to the wall
  • New shutters built for the bunk bedroom
  • Table tennis table delivered
  • All beds now have decent pillows
  • There are now warm spring duvets for all the beds
  • Additional crockery and cutlery bought (necessary with the dishwasher!)
  • Additional serving plates bought
  • Another sofa - we now have a sofa by the large doors: perfect for lounging on with a book!
There is still more to do (there always is!), but I am happy that the house is getting better and better each year.

Finally, a very big thank you to Bill who accompanied me on my trip and helped with a lot of the work.